Project Salient Features

Project Location
Latitude 28°12’’01” N to 28°59’12” N
Longitude 85°10’11” E to 85°12’01” E
Rural Municipality Kispang Rural Municipality (Nuwakot District)
Uttargaya Rural Municipality (Rasuwa District)
Districts Nuwakot and Rasuwa
Access Road
Access to Powerhouse site from Betrawati Bazar 3 km
Road from Powerhouse to Intake  5 km
Project road 1.3 km
Hydrology
Total Area upstream of intake site (UT3A Dam site) 4577 km2
Highest point of the catchment 7406 m (Ganesh Himalaya)
Long-term annual average flow 192  m³/s
40 % Exceedance flow 111.4 m³/s
90 % Exceedance flow 36.0 m³/s
1:100 years flood at Intake area 2718 m³/s
1:100 years flood at Powerhouse site 2880 m³/s
Compensation flow 4.007 m³/s
Design flow  (71 % exceedance flow) 51 m³/s
Geology
Headrace intake portal area Gneiss
Tunnel alignment rock type Dominant rocks are quartzitic schist and schist with small portion of gneiss
Lining type in headrace tunnel 63 % shotcrete lined and 37 % concrete lined
Tunnel rock mass classification Class II to V, Good to Very poor 
Surge tank and penstock area (rock) Quartzite and schist, rock class III , IV and V
Powerhouse Area Alluvial and colluvial deposit quartzite and schist at 30 m to 40 m depth
Tailrace Alluvial deposit
Geological rating of the project Fair
Headpond / Intake
Headpond Size  29m x 5.2 to 11.0 m x 7.35 to 14.8 m 
Bottom level of Headpond 714.2 m
Submergence depth 11.8 m  
Headpond / Intake  52.3 m
Approach Pressure Conduit 
Box Culvert Size 5.1m x 5.1 m Square and 5.1 m Diameter
Bottom Level Elevation 714.9 m
Length of R.C.C. box culvert including 40m Concrete Covered Steel Pipe 283.47 m
Headrace Tunnel
Total Length (Tunnel Start point to Surge Tank) 3,883.02  m
Slope  0.28%
No. of Bends 9
Surge Tank
Diameter 15 m
Height 43 m
Lining thickness 1 m concrete
Minimum Surge Water Level El 713.62 m
Maximum Surge Water Level El 739.62 m
Sub-horizontal pressure tunnel up to penstock stop log
Dimensions  4.2 m x 4.2 m (square)
Length  34 m (including transition from circular headrace tunnel to square pressure tunnel)
Thickness of concrete lining 300 mm
Steel Lining thickness 14 mm 
Penstock stop log at the downstream side of the surge tank
Dimensions of stop logs 4.5 m x 4.5 m
Level of operating floor  750.00 m
Vertical Penstock Shaft
Diameter  4.2 m (circular)
Length  66.51 m (including bends)
Lining 300 mm concrete 
Steel lining thickness 18 mm
Horizontal penstock shaft
Diameter  4.2 m (circular)
Length  80.62 m
Thickness of concrete lining 300 mm
Steel lining thickness 18 mm
Powerhouse ( Semi-Underground)
Length x width x height 55.44 m×19.30m×32.37m
Center line of Turbine El 632.81 m
Invert Level of Draft Tube El 626.73 m
Tailrace
Length  115.06 m 
Size of Tailrace conduit 6.00m W x 5.0m H
Turbine 
Number of generating units 2
Turbine Type Francis (vertical axis)
Rated Output 19.3 MW
Weighted Guaranteed Efficiency  ≥ 92.5%
Speed 375 rpm
Maximum Overspeed  544 rpm
Transmission (132 kV)
UT3B  HEP power will be transmitted to Integrated Nepal Power System (Double circuit) at Trishuli 3B Hub Sub-station  3 km
Switchyard 
Type 132 kV AIS
Transformer
Type Outdoor
Rating 23 MVA
Frequency 50 Hz
Number of units 2
Guaranteed Weighted Average Efficiency 99.23%
Generator
Rating 23 MVA
Speed 375 rpm
Number of poles 16
Frequency 50 Hz
Number of Units 2
Rated voltage 11 kV
Guaranteed Weighted Average Efficiency ≥ 97%
Power and Energy (at design discharge)
Maximum Goss Head  90 m
Installed capacity  37 MW
Dry season energy  134.88 GWh/year
Wet season energy 157.70 GWh/year
Average energy 292.58 GWh/year